Skip to content

Ashley River Boatworks

Boat Repair, Restoration, Building

  • Home
  • About Us
  • Contact Us
  • Projects
    • Anchor Locker
    • Canoe Restoration
    • Chris Craft 17 ft. Runabout
    • Key West 19 CC Repower
    • Palm Beach 22
    • SeaRay Sundancer Windlass
    • Sole Repair
    • Varnishing Stella
    • Xantrex inverter-charger
  • Boatbuilding methods
    • Boat structure
    • Electrical
    • Engine & Mechanical
    • Finishing
    • Frames
    • Half hull model
    • Laminating to a curve
    • Lofting
    • Lumber
    • Safety features
    • Setting up
    • Steam bending wood
  • Privacy Policy

Tag: mahogany

Posted on July 14, 2018November 29, 2022

Assembling the Transom Frame

Aft view
Assembled transom frame viewed from aft.

We’ve been talking about making all the pieces for the transom of our Palm Beach 22.  If you missed that part of the discussion, you can check it out at making the Transom Cheeks and Making the Transom Bows.  Now it’s time to put these parts together into a unified whole.  We need some guideposts, something to tell us how this piece should look when we’ve put it together successfully. Continue reading “Assembling the Transom Frame”

Share this:

  • Click to email a link to a friend (Opens in new window) Email
  • Click to print (Opens in new window) Print
  • More
  • Click to share on Facebook (Opens in new window) Facebook
  • Click to share on LinkedIn (Opens in new window) LinkedIn
  • Click to share on Pinterest (Opens in new window) Pinterest
  • Click to share on Pocket (Opens in new window) Pocket
  • Click to share on Telegram (Opens in new window) Telegram
  • Click to share on Reddit (Opens in new window) Reddit
  • Click to share on X (Opens in new window) X
  • Click to share on Tumblr (Opens in new window) Tumblr
  • Click to share on WhatsApp (Opens in new window) WhatsApp

Like this:

Like Loading...

Recent Posts

  • Spraying the PB22
  • Building a Temporary Spray Booth
  • Nip and Tuck for Lady Jane
  • Fitting the Mechanicals on the PB22
  • The Strut, Shaft, and Shaft Log

Recent Comments

  • Wally on Fairing the Hull Before the Final Layer
  • Paul on Fitting the Mechanicals on the PB22
  • Tim Taylor on Fitting the Mechanicals on the PB22
  • Paul on Fitting the Mechanicals on the PB22
  • Tim Taylor on Fitting the Mechanicals on the PB22

Archives

Categories

Subscribe to Blog via Email

Enter your email address to subscribe to this blog and receive notifications of new posts by email.

Join 217 other subscribers

Site Map

  • Home
  • About Us
  • Contact Us
  • Projects
    • Anchor Locker
    • Canoe Restoration
    • Chris Craft 17 ft. Runabout
    • Key West 19 CC Repower
    • Palm Beach 22
    • SeaRay Sundancer Windlass
    • Sole Repair
    • Varnishing Stella
    • Xantrex inverter-charger
  • Boatbuilding methods
    • Boat structure
    • Electrical
    • Engine & Mechanical
    • Finishing
    • Frames
    • Half hull model
    • Laminating to a curve
    • Lofting
    • Lumber
    • Safety features
    • Setting up
    • Steam bending wood
  • Privacy Policy
Privacy Policy Proudly powered by WordPress
 

Loading Comments...
 

    %d