Skip to content

Ashley River Boatworks

Boat Repair, Restoration, Building

  • Home
  • About Us
  • Contact Us
  • Projects
    • Anchor Locker
    • Canoe Restoration
    • Chris Craft 17 ft. Runabout
    • Key West 19 CC Repower
    • Palm Beach 22
    • SeaRay Sundancer Windlass
    • Sole Repair
    • Varnishing Stella
    • Xantrex inverter-charger
  • Boatbuilding methods
    • Boat structure
    • Electrical
    • Engine & Mechanical
    • Finishing
    • Frames
    • Half hull model
    • Laminating to a curve
    • Lofting
    • Lumber
    • Safety features
    • Setting up
    • Steam bending wood
  • Privacy Policy

Tag: wood canoe

Posted on August 21, 2016July 15, 2018

Restoring a Canoe–Step 1–Assess the Work

A thorough cleaning with Dawn dish washing detergent and water is the first step.
A thorough cleaning with Dawn dish washing detergent and water is the first step.

The first step in any restoration project is assessing and agreeing on the work to be done.  In this case, we agreed that Ashley River Boatworks would perform repairs needed to the boat, but that re-finishing would be the owner’s responsibility.  Often and owner has special talents and can save money by performing some of the work themselves.   Continue reading “Restoring a Canoe–Step 1–Assess the Work”

Share this:

  • Click to email a link to a friend (Opens in new window) Email
  • Click to print (Opens in new window) Print
  • More
  • Click to share on Facebook (Opens in new window) Facebook
  • Click to share on LinkedIn (Opens in new window) LinkedIn
  • Click to share on Pinterest (Opens in new window) Pinterest
  • Click to share on Pocket (Opens in new window) Pocket
  • Click to share on Telegram (Opens in new window) Telegram
  • Click to share on Reddit (Opens in new window) Reddit
  • Click to share on X (Opens in new window) X
  • Click to share on Tumblr (Opens in new window) Tumblr
  • Click to share on WhatsApp (Opens in new window) WhatsApp

Like this:

Like Loading...

Recent Posts

  • Spraying the PB22
  • Building a Temporary Spray Booth
  • Nip and Tuck for Lady Jane
  • Fitting the Mechanicals on the PB22
  • The Strut, Shaft, and Shaft Log

Recent Comments

  • Paul on Fitting the Mechanicals on the PB22
  • Tim Taylor on Fitting the Mechanicals on the PB22
  • Paul on Fitting the Mechanicals on the PB22
  • Tim Taylor on Fitting the Mechanicals on the PB22
  • Tim Taylor on Fitting the Mechanicals on the PB22

Archives

Categories

Subscribe to Blog via Email

Enter your email address to subscribe to this blog and receive notifications of new posts by email.

Join 217 other subscribers

Site Map

  • Home
  • About Us
  • Contact Us
  • Projects
    • Anchor Locker
    • Canoe Restoration
    • Chris Craft 17 ft. Runabout
    • Key West 19 CC Repower
    • Palm Beach 22
    • SeaRay Sundancer Windlass
    • Sole Repair
    • Varnishing Stella
    • Xantrex inverter-charger
  • Boatbuilding methods
    • Boat structure
    • Electrical
    • Engine & Mechanical
    • Finishing
    • Frames
    • Half hull model
    • Laminating to a curve
    • Lofting
    • Lumber
    • Safety features
    • Setting up
    • Steam bending wood
  • Privacy Policy
Privacy Policy Proudly powered by WordPress
 

Loading Comments...
 

    %d